Cooperation

Contact Us

Position:Home > Product > Construction ProcessConstruction Process

Yan Sen Tai Construction Manual
 

Yan Sen Tai natural paint Construction Manual:suit for fine decoration paint, comfortable decoration paint, luxury decoration paint , all-round paint.


1、roller painting
Step 1: Tools
Tools include:
(1) Motor stirrer(2) 100-mesh filter screen or small and medium filter (3) Big and small rollers (4) Plastic bucket 

Step 2: Water-powder mixture

Fully stir mixed water and powder at 1:1 ratio with the motor stirrer for about ten minutes. After the solution is evenly stirred without powder, pour it in filter screen and filter it. The construction material will be ready.
Step 3: Wall treatment before construction:
Before construction, paint fixation accelerator on walls with waterproof putty or ordinary puff. Ensure base layer is flat, clean and has no floating dust, cracks, peelings and hollow imperfections.
Step 4: Construction
Evenly the walls with big roller. Evenly paint internal corners with small roller another time. Timely paint the walls for another time as the first time before the coating material get dry. After the second painting, the construction will be completed. Theoretical standard: 0.2~0.3kg/㎡.
Notes: After the first painting, you should timely implement the second painting, or it will be fail to paint as the material has a good water absorption.

2. Spraying painting
Step 1: Equipment: use German or domestic high-pressure airless sprayer and 0.021~0.025-inch spray nozzle.
Step 2: Mixture: Stir evenly the water and powder at 1:1 ratio (pour water first) until there is no powdery particle (as rolling painting).
Step 3: Spraying painting: spray the walls at 60° angle in the fan shape. The constructor stands straight with the spray gun at a distance of 0.5 meter and 1 meter to the walls and moves at the speed of 4 s/m. Firstly paint the walls in the horizontal direction and secondly paint the walls in the vertical direction.

3. Artistic patterns
Step 1: Tools
(1) Motor stirrer (2) 100-mesh filter screen or small and medium filter (3) Big and small rollers (4) Plastic bucket (5) Adhesive sticker with patterns
Step 2: Clean the walls as in the rolling painting.
Step 3: After the walls get dry, stick the adhesive sticker on the walls.
Step 4: Paint the coating material with required color in the space left by adhesive sticker. 
Step 5: Tear off the adhesive sticker after the walls are half-dry.

4. Treatment of remaining coating material
After completing the project, pour clean water in the container and close the lid or cover the top of the bucket with plastic cloth. This water-sealing method can ensure that the coating material don"t clot or deposit within 100 days. Pour out the water in the next use of the coating material. Timely clean the stirrer and container after completing the project.
Standard operation process of Yan Sen Tai Natural Coating Material: applicable to printing products such as fine decoration paint (functional paint is the same as fine decoration paint), comfortable decoration paint (functional paint is the same as comfortable decoration paint).

1. Scraping:
Step 1: Tools
Tools include:
(1) Motor stirrer (2) Trowel or steel scraper (3) Scraper (4) Plastic scraper (5) Plastic bucket

Step 2: Water-powder mixture
 Fully stir the mixed water and powder at 1:2 ratio (pour water first) with the small motor stirrer for about ten minutes. After the solution is evenly stirred without powder, the construction material will be ready.
Step 3: Wall treatment before construction
Before construction, paint fixation accelerator on walls with waterproof putty or ordinary puff. Ensure base layer is flat, clean and has no floating dust, cracks, peelings and hollow imperfections.
Step 4: Construction
Implement the first scraping painting with steel scraper or trowel in the horizontal direction. Implement the second scraping painting after about hour when the wall is dry. It needs to be scraped for three times. The third scraping painting can be directed implemented after the second painting. After completion, the coating shall be 1-1.2 millimeters deep.

Pattern treatment
As for the places with plaster lines in the corners and modeling arcs on the top, dilute this product into solution and paint two or three times with goat hair brush.
Notes: Some tools can be used to create texture effect.

2. Rolling painting
Step 1: Tools
Tools include:
(1) Motor stirrer (2) 80-mesh filter screen or small and medium filter (3) Big and small rollers (4) Plastic bucket
Step 2: Water-powder mixture
Fully stir the mixed water and powder at 0.8:1 ratio with the motor stirrer for about ten minutes. After the solution is evenly stirred without powder, pour it in filter screen and filter it. The construction material will be ready.
Step 3: Wall treatment before construction
Before construction, paint fixation accelerator on walls with waterproof putty or ordinary puff. Ensure base layer is flat, clean and has no floating dust, cracks, peelings and hollow imperfections. 
Step 4: Construction
Evenly the walls with big roller. Evenly paint internal corners with small roller another time. Timely paint the walls for another time as the first time before the coating material get dry. After the second painting, the construction will be completed. Theoretical standard: 0.2~0.3kg/㎡.

3. Spraying painting
Step 1: Equipment: use German Wagner HC940 Oil Sprayer or domestic high-pressure airless spraying machine and 0.021~0.025-inch spray nozzle.
Step 2: Mixture: Stir evenly the water and powder at 0.8:1 ratio (pour water first) until there is no powdery particle.
Step 3: Spraying painting: spray the walls at 60° angle in the fan shape. The constructor stands straight with the spray gun at a distance of 0.5 meter and 1 meter to the walls and moves at the speed of 4 s/m. Firstly paint the walls in the horizontal direction and secondly paint the walls in the vertical direction.

4. Printing pattern
Step 1: Tools
(1) Motor stirrer (2) 80-mesh filter screen or small and medium filter (3) Big and small rollers (4) Plastic bucket (5) Plastic scraper (6) 60-mesh silk screen
Step 2: Firstly clean the walls as in the rolling painting.
Fully stir the mixed water and powder at 1:2 ratio with the motor stirrer. After the solution is evenly stirred without powder, pour it in the filter screen and filter it. The printing pattern material will be ready.
Step 3: Place the silk-screen filter on against the walls and scrape the printing coating material on silk screen and scrape it on the wall.
Step 4: Scrape coating material on the walls for three or four times and timely clean the silk screen to prevent the blocking of silk screen.
Step 5: Polish wall surface with plastic scraper after the printing coating material gets dry.
Step 6: Repeated operation until all printing steps are completed.

5. Artistic patterns
Step 1: Tools
(1) Motor stirrer (2) 80-mesh filter screen or small and medium filter (3) Big and small rollers (4) Plastic bucket (5) Adhesive sticker with patterns
Step 2: Clean the walls as in the rolling painting.
Step 3: After the walls get dry, stick the adhesive sticker on the walls.
Step 4: Paint the coating material with required color in the space left by adhesive sticker.
Step 5: Tear off the adhesive sticker after the walls are half-dry.

6. Treatment of remaining coating material
After completing the project, pour clean water in the container and close the lid or cover the top of the bucket with plastic cloth. This water-sealing method can ensure that the coating material don"t clot or deposit within 100 days. Pour out the water in the next use of the coating material. Timely clean the stirrer and container after completing the project.